·
·
County Road C - Bridge replacement over Minnesota Commercial Railroad
(MCRR) located between Lexington Avenue and Victoria Street - Design funds
(construction in 2028).
County Road F - Collaborative Project with the City of Vadnais Heights for
roadway repair, City utility replacement, stormwater improvement, bicycle, and
pedestrian access improvements on County Road F between Rice Street and
Centerville Road - Design funds (construction in 2028).
·
Pennsylvania Avenue - Preliminary engineering, alternatives analysis and public
engagement for reconstruction between Rice Street and Mississippi Street -
Design funds (construction in 2029).
Roadway Pavement Preservation Improvements:
·
·
·
Century Avenue - Pavement resurfacing between Lower Afton Road and
Woodbine Avenue - 2025 construction funds.
County Road D - Pavement resurfacing between Flandreau Street and
Bittersweet Lane - 2025 construction funds.
County Road I - Pavement resurfacing and city utility repair between the Rice
Creek bridge and Lexington Avenue - 2025 construction funds.
Roadway Multimodal, Community, Accessibility, Resiliency, & Equity (MCARE)
Improvements:
·
Larpenteur Avenue - Pavement resurfacing, 4 to 3 lane conversion, potential
road diet, and trail installation between East Shore Drive and Flandreau Street -
Design funds (construction in 2027).
·
Long Lake Road/10th Street - Pavement resurfacing, 4 to 3 lane conversion,
stormwater improvements, pedestrian, and bicycle access improvements
between I-694 and Old Highway 8 - Design funds (construction in 2027 - Federal
HSIP grant).
·
·
·
Mounds View Boulevard - Pavement resurfacing, intersection safety
improvements, trail installation, pedestrian crossing safety improvements
between Pleasant View Drive and County Road H - Design funds (construction
in 2027 - Federal HSIP grant).
Silver Lake Road - Pavement resurfacing, 4 to 3 lane conversion, stormwater
improvements, pedestrian, and bicycle access improvements between
Mississippi Street and Mounds View Boulevard - Design funds (construction in
2027 - Federal HSIP grant).
Victoria Street - Pavement resurfacing and trail installation between County
Road C and Harriet Avenue - Design funds (construction in 2027).
Pedestrian Bicycle Improvements (projects led by requesting City):
·
·
·
·
Cleveland Avenue (St Paul) - Sidewalk installation and repair between Summit
Avenue and Marshall Street - 2025 construction funds.
County Road I (Shoreview) - Trail boardwalk improvements and repair -
Lexington Avenue to Chatsworth Street - 2025 construction funds.
Lexington Avenue (Roseville) - Multi use trail installation between Sandhurst
Drive and Sherren Street - 2025 construction funds.
Marshall Avenue (St Paul) - Sidewalk installation and repair between Snelling
Avenue and Albert Street - 2025 construction funds.
Stormwater Improvements:
·
·
·
Ditch Authority - Jurisdictional Transfers of various County ditches to local
watersheds - 2025 implementation funds.
Network Wide Drainage Study - Inventory and condition assessment of
stormwater assets throughout the County network - 2025 design funds.
Whitaker Pond - Stormwater pond holding volume restoration and other
functionality repairs - 2025 construction funds.
Miscellaneous Infrastructure Improvements: